Skip to content

Alabama

Flatbed trucking in Alabama, with Sundays already off the calendar

Flatbed trucking in Alabama starts with steel and ends with a rule most out-of-state drivers miss: a permitted oversize load cannot travel in Alabama at any time on a Sunday.

Our dispatchers book open-deck loads in and out of Alabama for owner-operators and small fleets on flatbeds, double drops, RGNs and lowboys. We plan around ALDOT's permit rules before you say yes, and you approve every load. We are a dispatch service working for you, not a broker and not a permit service.

Flatbed (48 or 53 ft) side profile: loaded deck height about 52-60 in52-60 in48-53 ft deck

Quick facts

Permit office

ALDOT Permit Office, Montgomery

Oversize travel

Daylight only. No travel at any time on Sundays

Annual permit

$100: up to 12 ft wide, 14 ft high, 75 ft long, 150,000 lb

Removable parts

Buckets, booms and counterweights ride separately when over legal

Escort at

12 ft wide (one), over 14 ft wide (front and rear)

Port of Mobile steel

Slab terminal on a 50 ft channel, coil facility on 40 ft of water

Open-deck freight in Alabama

Flatbed trucking companies in Alabama run a lot of metal and a lot of machines.

  • Steel through Mobile. The Alabama Port Authority runs an import slab terminal on a 50 ft deep channel and a steel coil handling facility on 40 ft of water at the Port of Mobile. Slabs go to mills; coils go to processors and manufacturers inland. Coil loads need coil racks or chocks and the securement in 49 CFR 393.120.
  • Equipment. Construction and forestry machines move between dealers, jobsites and logging tracts. Alabama has a rule that changes how equipment is hauled here (more below).
  • Building materials and forest products. Lumber, poles and building products come out of mills across the state and go to yards in Alabama and the states around it.

Alabama permits: ALDOT rules that change the load

Oversize and overweight permits in Alabama come from the ALDOT Permit Office in Montgomery. The federal baseline applies: 8 ft 6 in wide on the National Network (23 CFR 658.15) and 80,000 lb gross on the Interstate.

ALDOT also sells an annual permit for $100. It covers a vehicle and load up to 150,000 lb, 12 ft wide, 75 ft long and 14 ft high, with a single axle up to 22,000 lb, for 12 months on the state highway system. Annual permits are applied for online or in writing and paid in advance.

Three ALDOT conditions catch carriers off guard:

  • Removable parts ride separately. On a state highway, when the load is over legal limits, anything that can be removed to cut the weight (buckets, booms, counterweights, lifting devices) must come off and travel separately. Bulldozer blades count as non-separable.
  • Half a mile apart. Permitted loads keep half a mile between each other.
  • Pull off in traffic. When traffic backs up behind the load, the driver must get off the traveled road until it clears.

Escorts (Ala. Admin. Code 450-3-1-.05): a front escort with a height pole over 15 ft 6 in tall; one escort for loads 12 to 14 ft wide (front on two-lane roads, rear on multilane); front and rear over 14 ft wide; a rear escort from 90 to 125 ft long, front and rear from 125 to 150 ft, and law enforcement front and rear over 150 ft. A rear overhang of more than 5 ft needs a rear escort.

When a permitted load can move in Alabama

From ALDOT's permit conditions, Ala. Admin. Code 450-3-1-.04 (amended effective June 14, 2020).

RuleWhat it saysSource
DaylightPermitted vehicles may travel daylight hours only.450-3-1-.04(2)
SundaysNo travel at any time on Sundays.450-3-1-.04(2)
HolidaysNo travel on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.450-3-1-.04(2)
VisibilityNo travel when visibility is under 500 ft or weather makes travel hazardous. Park at the first safe spot off the road.450-3-1-.04(3)
Signs and flagsOVERSIZE LOAD sign 7 ft wide by 18 in high, front and rear. 18 in orange or red flags at the four corners. Flashing amber light visible 360 degrees at 500 ft.450-3-1-.04(9)
Checked November 2, 2026. The permit in the cab has the final word on your route and conditions.

Seasonal rules in Alabama

We did not find a frost law program in Alabama. Fog and heavy rain can push visibility under the 500 ft line and park a permitted load. Hurricane season brings relief and rebuilding freight on the coast, moved under emergency declarations that each carry their own terms and end dates. FMCSA lists the active ones. We read the declaration before booking against it, and we never promise a storm means more loads.

How we plan an Alabama load

  1. Take Sunday out first

    An oversize load that cannot deliver by Saturday sits until Monday. We set pickup days so you are not burning a weekend in a truck stop.

  2. Split the machine if the rule says so

    If an excavator with its bucket is over legal, the bucket may need its own ride. We know that before quoting, not at the scale house.

  3. Size the deck to the steel

    Coils, slabs and plate are heavy and short. Axle weights and coil securement come before deck length.

  4. Plan the reload

    From Mobile or Birmingham, we look for the next load toward your home before you unload.

EXAMPLE: a coil load out of Mobile

EXAMPLE

Rate sheet · worked numbers

48 ft flatbed with coil racks, 2 trucks, MC 1 year old

Two steel coils from the Port of Mobile to a processor in north Alabama, legal weight. Rates are made up to show the math.

Linehaul
$1,250.00
Detention, 2 hours at the port
$100.00
Gross load pay
$1,350.00
Tier
Standard, 5%
Dispatch fee
$67.50
You keep
$1,282.50

EXAMPLE numbers. We never promise a rate, a reload or a weekly gross.

What dispatch costs in Alabama

Same three tiers in every state. Read the fee page for what is included.

New authority

6%

of gross load pay

Any carrier whose MC is under 6 months old, any number of trucks

Standard

5%

of gross load pay

1 or 2 trucks, MC 6 months old or older

Applies on this page

Fleet

4%

of gross load pay

3 or more trucks, MC 6 months old or older

  • No setup fee and no minimums
  • Charged only on loads you haul. No haul, no pay.
  • Month-to-month. Cancel with 30 days notice.
  • Tiers change automatically as your MC ages or your fleet grows

flatbed dispatcher fees · work out your dispatch fee

What deck do you run in Alabama?

Pick your deck and start the application. About 2 minutes, no setup fee.

Get ready for your next Alabama load

Questions carriers ask

Can oversize loads travel on Sunday in Alabama?

No. ALDOT's permit conditions say travel is not permitted at any time on Sundays, or on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. On other days, permitted loads move in daylight only.

Do I have to remove the bucket to haul an excavator in Alabama?

If the load is over legal limits on a state highway, yes: ALDOT requires removable parts such as buckets, booms and counterweights to be taken off and hauled separately. Bulldozer blades are treated as non-separable. If the machine is legal with the bucket on, the rule does not come into play.

Is there an annual oversize permit in Alabama?

Yes. ALDOT's annual permit costs $100 and covers loads up to 150,000 lb, 12 ft wide, 75 ft long and 14 ft high for 12 months on the state highway system. Bigger loads need single-trip permits.

Do you work with flatbed trucking companies in Alabama?

Yes. We dispatch owner-operators and small fleets running open deck under their own MC, based in Alabama or running through it. Apply here; a dispatcher calls you back.

Updated

General information, not legal, tax, insurance or financial advice. Check the official source before you act.

Next load

Running open deck in Alabama?

Tell us your deck, home base and lanes. A dispatcher calls back, shows your tier and plans loads that do not end on a Sunday shoulder.